OIL & GAS · 45+ YEARS OF FIELD EXPERIENCE

Metrological assurance — the foundation of custody transfer accounting

Pro meter SIA · 45+ years of custody transfer practice

Knowledge that protects your project

Oil and gas custody transfer — without errors, losses or disputes.

We know what to do at every stage of a project — and we will teach your team to do the same. We can join from the very beginning or take over at any stage, even when the project seems hopeless.

With our materials, your engineers, managers and commission members work with confidence: they are protected by knowledge, documentation and legal certainty. That means your job, your reputation and your money stay safe.

People say we are lucky. That is true — but our luck is backed by knowledge.

  • We know what to doTechnically and metrologically justified decisions
  • We know why it is rightStandards, traceability, accuracy
  • We protect the resultDocuments and evidence that withstand a dispute

Who are you in the project?

Choose your role — we will show what matters to you, which modules and services will help, and where to start.

Available Coming soon On request Free

📁Managers and project leadersDecision-makers, technical directors, project managers

Risk: decisions made at the start determine metering accuracy — and the money — for decades ahead.

You get: a view of the entire metering chain, control points for every stage and an independent expert assessment.

Pages: Custody Transfer · Our Projects

Order an express diagnostic →
📁Developers, manufacturers, dealersOEMs, equipment suppliers, dealers

Risk: an instrument performs perfectly on the test bench — and fails to hold accuracy under real site conditions.

You get: an understanding of what the buyer actually needs, real operating requirements and feedback from the field.

Pages: For Dealers

Propose cooperation →
📁Delivering and receiving partiesRepresentatives of the product supplier and recipient

Risk: each party trusts its own figures — and the dispute is won by whoever has the stronger evidence.

You get: traceability of the result from reference standard to transfer act, and an evidentiary base for any dispute.

Pages: Legal Shield

Analyse a discrepancy →
📁Design engineersProcess, instrumentation and control, electrical, civil

Risk: every design section affects the accuracy of the commercial result — even civil works.

You get: metrological requirements for each section and a design that passes FAT/SAT without rework.

Pages: Metering Station Engineering

Order a design review →
📁Commissioning engineersLead engineers: start-up, commissioning, methods, protocols

Risk: an error built in at commissioning can stay invisible for years — while money is lost every day.

You get: a step-by-step control sequence and working protocols for every measuring instrument.

Pages: Calibration & Verification

FAT/SAT support →
📁Metrologists and laboratoriesMetrologists, accredited laboratories, verification officers

Risk: the certificate exists, but the traceability chain is broken — and the result loses its legal force.

You get: complete traceability, methods and uncertainty budget logic.

Pages: Laboratories · Calibration

Discuss your laboratory →
📁Economists and lawyersContract, finance and legal departments

Risk: the contract is legally flawless but technically vulnerable — and the dispute is lost on metrology.

You get: Legal Shield — contracts, documents and evidence that withstand a dispute. Legal theory is only the foundation here. What matters most is a consultation with a lead engineer who knows every possible risk.

Pages: Legal Shield

Consult a lead engineer →
📁Procurement and tender committeesProcurement department, tender committee

Risk: the cheapest supplier was chosen — and the metrological requirements were left out of the specification.

You get: a list of what must be specified before choosing a supplier: metrology, laboratory, FAT/SAT, contractor qualifications.

Check the specification before tender →
📁Operation and maintenanceMetering station manager, operators, maintenance team

Risk: the system works — until the verification or a claim arrives.

You get: maintenance levels 1/2/3, verification readiness, quality control and an orderly protocol archive.

Pages: Metering Station Maintenance · Outsourcing

Order a maintenance audit →
📁Acceptance commissions and auditorsCommission members, inspectors, internal and external audit

Risk: the commission signs the act — and is responsible for what it did not check.

You get: an understanding of what to check on site and how, a document checklist and commission roles.

Pages: Legal Shield

Prepare for a commission →
📁Training and staff developmentHR, training centres, department heads

Risk: experience leaves with people, and newcomers are taught “from memory”.

You get: module packages for each role, training materials for your project and Train-the-Trainer programmes.

  • EM GlossaryfreeA common language for the team: RU / EN / LV
  • EM Module CatalogfreeThe whole library by project lifecycle stage
  • Role packageon requestMetrology, laboratory, procurement, operation, commissions
Build a package for your team →
📁Students, graduates, researchersUniversities, PhD students, researchers

Your task: find a relevant topic backed by real practice.

You get: in our materials — even the public ones — you will find topics for theses and dissertations.

Pages: Publications

Discuss a research topic →
🛠️Need help right nowProject stuck? We are trouble-shooters — we take over at any stage, even when the situation seems hopeless

The whole library — like folders on your computer

Open the folder to see every EM module at once: what each one covers and what is available now.

EM Technical GuidePro meter › complete module library22 modules
ModuleWhat it coversStatus
EM-1 · Series OverviewMap of the whole library: what is where and where to startin progress EM-2 · Tender & BiddingWhat to specify before choosing a supplieron request EM-3 · Engineering A–ZThe full metering station route for the lead metrology engineeron request EM-4 · DocumentationDocuments as management and financial protectionon request EM-5 · Pre-DesignTerms of Reference, FEED, measurement method and accuracy classon request EM-6 · DesignHow each design section affects the accuracy of the resulton request EM-7 · Start-Up & CommissioningInstallation, loop check, SAT, first commercial resulton request EM-8 · LaboratoriesLaboratory role, methods, flow computer verificationon request EM-9 · Data & ReportingFiscal data, archives, audit trailon request EM-10 · Metrological SupportMetrology of commercial operations as one systemon request EM-11 · Error & UncertaintyMPE, GUM and how to defend the result in a disputeon request EM-12 · Verification SchemeTraceability: from reference standard to transfer actcoming soon EM-13 · Verification ProtocolsWorking protocols for every measuring instrumenton request EM-14 · Accuracy ImprovementPractical Pro meter methods for metering stationsavailable EM-15 · Instruments OverviewMass meters, provers, densitometers, flow computers: what to choose and whyon request EM-16 · Technical MaintenanceMaintenance levels, verification readiness, protocol archiveon request EM-17 · Specification AlignmentWhat the factory expects and what the customer needs — aligned from the factory designon request EM-18 · Commission & AuditRemote and field audit, commission work, Legal Shieldcoming soon EM-19 · Perspectives & R&DTrends, digitalisation, test rigs, scientific co-authorshipon request EM-20 · GlossaryUnified custody transfer terminology RU / EN / LVfree EM-21 · Field VerificationPreparation, protocol-based measurements, reporton request EM-22 · Quality Control SkidQCS, in-line density, samplingon request
22 modules · 1 available · 2 coming soon · 1 freeDetailed catalog · Shop

Site map — everything in one window

Pro meter sections as folders: open one and go straight to the page.

prometer.pro› English version6 sections
Pro meter companyWho we are, our experience and completed projects2 pages About Pro meterPro meter SIA, Ventspils: 45+ years of custody transfer practice Our ProjectsCompleted facilities and engineering solutions
Custody transfer and engineeringThe engineering foundation: from specification to operation5 pages Custody TransferWhere measurement turns into money — and how to protect it Metering Station EngineeringDesigning and building metering systems Tender GuideWhat to specify before choosing a supplier — free Metering Station MaintenanceMaintenance, diagnostics, verification readiness Engineering ReferenceOverview of Pro meter engineering materials
Metrology and Legal ShieldVerification, calibration, evidentiary protection of the result2 pages Calibration & VerificationTraceability and practical metrology Legal ShieldProtocols, archives, evidence for disputes and commissions
ServicesEngineering work for your specific task3 pages LaboratoriesLaboratory support, methods, accreditation For Dealers & ManufacturersCooperation with OEMs and equipment dealers OutsourcingContract-based metrological support
Technical Guide and ShopEM modules, glossary, purchase4 pages EM Technical Guide ShopPublished modules to buy and download EM Module CatalogThe whole library by project lifecycle stage EM-14 · Accuracy ImprovementPublished module — Public and NDA Expert EM GlossaryCustody transfer terminology RU / EN / LV — free
News, publications, contactWhat is new, articles and how to reach us4 pages NewsEvents, module releases, meetings BlogNotes and comments on custody transfer practice PublicationsPro meter articles and professional positions ContactDescribe your task — we will propose a route to the solution

Flagship module · Available now

EM-14 · Methods for Improving Accuracy and Measurement Assurance in Custody Transfer Metering Systems

A topic that never goes out of date: metering accuracy means the parties’ money, disputes and liability.

Who it is for

Owners and operators of custody transfer metering stations, design engineers, metrologists and laboratories, acceptance commissions. Students, PhD candidates and researchers — topics for theses and dissertations.

Inside the Public Professional Edition

  • a 52-page handbook;
  • where a metering system loses accuracy and how to detect it;
  • how to prepare a measurement result for a dispute between the parties — Legal Shield;
  • Excel reference workbooks;
  • licence and terms of use.

The Public edition shows where and why accuracy is lost. Working correction methods are in the NDA Expert Edition.

Available now

Public Professional Edition

For engineers, project teams, laboratories and training. Instant download after payment.

Buy
On request

NDA Expert Edition

Working methods and calculations for your project. Delivered under a contract and NDA.

Request

Modules in development can be ordered ahead of schedule, and a set of modules can be assembled for a specific project. Describe your task

Services

Where Pro meter takes responsibility

Each direction is a service we deliver and a topic the EM Technical Guide covers in writing. Start with the one closest to your project.

First step

Express diagnostic — 60–120 minutes

A short online review of your situation: the task, the risks, the next step. You receive a brief memo on what to do next — an audit, work under NDA, or your own team is enough.

Not sure where to start? Write briefly: your industry, what the project is and its stage — a new project, a tender, problems ordering equipment, a design needed or problems with the design. We will understand each other in any language: we’ll prepare a simple questionnaire or come to you.

Book a diagnostic

Metrology Review & Audit

A review of your metering station, documents and protocols: scope, risks, next steps. Full audit and acceptance-commission support — remotely or on site.

In the Guide: EM-18 · EM-9 · catalog

Engineering & Design

From customer requirements and tender to design, FAT/SAT and commissioning. Source-data audit, specification packages, control of every discipline.

In the Guide: EM-2 · EM-3 · EM-5 · EM-6 · EM-7 · catalog

Custody Transfer

Fiscal metering on transit corridors, inter-company projects and marine terminals. Formulas, corrections, reconciliation rules and acceptance criteria — from day one to a dispute.

In the Guide: EM-10 · EM-12 · EM-17 · catalog

Calibration & Verification

Field work on live systems without shutdown: methods, protocols, uncertainty budgets and traceability to standards — in a form accepted by inspectors and the parties.

In the Guide: EM-13 · EM-21 · EM-11 · EM-14 · catalog

Technical Service & Metrology Support

The station stays inspection-ready: maintenance programmes, in-situ control, instrument register, calibration schedules without disruption.

In the Guide: EM-16 · EM-22 · EM-15 · catalog

Publications & Scientific Supervision

Preparing a journal article, a thesis or a dissertation? A technical editor, reviewer or supervisor — with what you won’t find online, in AI or in technical literature.

In the Guide: EM-20 · catalog

How we work

From first message to result — four steps

You can start without risk: the first review is short, and materials can be anonymised.

  1. 1

    Task

    You describe the situation by email or through the contact form. The site and the parties need not be named.

  2. 2

    Review

    Express diagnostic, 60–120 minutes: where the risks are, what the options are, what the next step is.

  3. 3

    Format

    We agree the form of work: an EM module, an audit, work under NDA or ongoing support. Scope, timing and terms — in writing.

  4. 4

    Work

    We deliver under contract. The result is a document that stands up to an inspector’s review and a dispute between the parties.

What to send for the first review

  1. the process flow diagram of the metering station;
  2. the list of measuring instruments: type, diameter, ranges;
  3. current measurement and verification procedures;
  4. the latest verification or calibration reports;
  5. the metering section of the contract or custody transfer rules;
  6. a description of the problem: discrepancies, reports, claims.

Don’t have everything? Send what you have — part of it is enough for a review.

Confidential from the first contact

Materials can be sent anonymised — without names of sites, companies or parties.

Working documents are exchanged after an NDA is signed.

We name clients and projects only with their consent.

Describe your task

Experience

Real sites behind the methods

Everything in the EM Technical Guide has been tested on operating metering stations, terminals and transit corridors.

  • 45+ yearsin oil and gas custody transfer metering
  • 20+ and 100+international and national projects
  • 30+ yearswith Emerson equipment, FB flow computer certificate

Among our sites and partners

Ventspils crude oil terminal No. 703 · crude oil metering station maintenance at the Mažeikiai refinery · Latvijas Gāze · LatRosTrans · Ventamonjaks · NICHIMEN (Japan) · VNIIR and VNIIMS

Project details, design specifics by discipline and the innovations in our projects are in module EM-6 · Design · module catalog

What’s new

What’s published and what’s coming

New material comes out every week. Check the news for everything that has appeared recently.

Pro meter News

New modules, public editions, articles and events — short and to the point.

In development now

  • EM-1295% ready · coming to the shop
  • EM-1895% ready · coming to the shop
  • EM-21 · public editionfor the autumn tenders
  • EM-17 · Specification Alignment: Customer and Manufacturerin progress

Publications

Our articles in scientific and technical journals and applied material on custody transfer metering and metrology.

Preparing an article?

Need a technical editor, reviewer or supervisor? Get in touch. We get to grips with technological processes quickly and help with what you won’t find online, in AI or in technical literature.

Describe your task — we’ll start with a review

A few lines about the situation are enough. You need not name the site or the parties: the first review can be done on anonymised material.

  • Write in any language — we work in English, Russian and Latvian
  • Confidential from the first contact
  • Working documents — after NDA
Scroll to Top